← All schools
Elementary

Laytonsville Elementary

Damascus, Gaithersburg cluster · 21401 Laytonsville Rd, 20882

MCAP ELA

Class size

Average class size by grade band over recent years, with the latest year measured against MCPS's published guideline.

Average class size by school year
Data table
Average class size by school year — average class size by school year (* = not comparable)
Series2017-20182018-20192019-20202020-20212021-20222022-20232023-20242024-2025
Kindergarten21.0 *19.0 *20.7 *14.0 *17.7 *15.3 *17.021.0
Grades 1 to 324.9 *23.0 *21.3 *14.8 *14.8 *12.1 *19.419.6
Grades 4 to 520.3 *29.5 *22.7 *19.3 *18.0 *16.2 *29.022.2
  • Kindergarten21target 25 · within guideline
  • Grades 1 to 319.6target 26–27 · within guideline
  • Grades 4 to 522.2target 29 · within guideline

Source: MCPS School Profiles class-size extract vs. MCPS published class-size guidelines · Updated: 2024-2025

Special education

Students with IEPs
15.5%
0.1 vs. typical
of enrollment · 55 students
504 plans
5.2%
1 vs. typical
of enrollment · 18 students
Caseload
9
6 vs. typical
students per special-ed teacher
Teachers per 100
9.84
3.2 vs. typical
teacher FTE per 100 with IEPs
Paras per 100
10.69
3.8 vs. typical
paraeducator FTE per 100 with IEPs
Inclusion (LRE)
75%
3.4 vs. typical
in general education 80%+ of the day
Inclusion (LRE) over time
Data table
Inclusion (LRE) over time
Series202320242025
Inclusion %71%69.2%78.3%

Time in general education (2025): 80%+ of the day 75% · 40–79% ≤5% · under 40% 25%

Staffing rates are per 100 students with IEPs; staffing is from 2025. Withheld values reflect privacy suppression, not zero.

Source: MCPS School Profiles / unified facts (LRE, staffing, SWD enrollment) · Updated: inclusion 2025, staffing 2025

Staffing

Staff relative to enrollment. The chip compares this school to the typical elementary school at this level.

Teachers
7.8
0.1 vs. typical
per 100 students
Support services
2.4
0.3 vs. typical
per 100 students
Counselors
2.9
0.2 vs. typical
per 1,000 students

Special education & multilingual support

Special-ed teachers
9.8
3.2 vs. typical
per 100 students with disabilities
Special-ed paraeducators
10.7
3.8 vs. typical
per 100 students with disabilities
ELD teachers
2.3
0.1 vs. typical
per 100 multilingual learners

Source: MCPS unified facts — staff FTE per student (support services = instructional support staff)

Programs & services

Special, choice, and support programs offered at this school — from magnet and application programs to career pathways and special-education services.

Special Education

  • Adapted Physical Education
  • Home School Model - Elementary
  • School Community Based (SCB)
  • Speech/Language Resource K-12

Source: MCPS Office of Student Affairs program catalog (2025). Find schools by program →

Enrollment & capacity outlook

A ten-year probabilistic enrollment forecast for this school, checked against its capacity. Part of the countywide capacity outlook, which explains the method and its track record.

Capacity risk, 2030–31
Low
0% chance over capacity
Forecast enrollment, 2030–31
366
likely range 308–433
Capacity
507
funded projects included
Forecast confidence
Medium
not expected over capacity
actual forecast median 80% range MCPS projection capacity
Data table
School yearActualForecast (p10–p90)MCPS projection
2017–18377
2018–19384
2019–20392
2020–21369
2021–22347
2022–23333
2023–24365
2024–25355
2025–26365
2026–27363 (338–388)367
2027–28367 (330–406)369
2028–29368 (322–418)366
2029–30366 (313–426)366
2030–31366 (308–433)359
2031–32360 (300–424)
2032–33356 (297–422)
2033–34354 (296–420)
2034–35354 (296–422)
2035–36354 (295–420)

Source: mc-development forecast model — base year SY 2025–26; boundaries 2024-2025; development snapshot 2026-06-02 · Updated: 2026-07-31T00:00:00Z

Data: MSDE State Report Card (2019–2025), MCPS official Sept 30, 2025 enrollment count (extends the enrollment trend to 2025-26), MCPS School Profiles & unified facts, U.S. Census ACS 2024, MD SDAT. “≥95” / “≤5” and dropped groups are privacy-suppressed for small counts — withheld, not zero. Independent project, not affiliated with MCPS or MSDE.